HOME
Company Overview
Products for Sales
 ●Steel Sales Div.
 ●Raw material Sales Div.
 ●Construction materials Sales Div.
 【Civil Engineering】
 ・Tie rod for Civil Engineering
 ・GK method
 ・Caisson lifting steel bars /Anchor bolt
 【Building】
 ・Tension rod for building
 ・Tension rod connection method

 ●Service engineering Div.
 
Affiliated companies’ information
GOTETSU SANGYO CO.,LTD

   日本語
   English
   中文(簡体字)
   中文(繁体字)
   한국어
 
  GK method

Construction-method in a short time.
Our company's unique built-construction method; "Tie rod Advanced Construction-GK method".


Tie rod used as a tension material for iron-sheet pile, steel-tubing sheet pile, have been enlarged in length and diameter, so it has been increasingly taking a longer hours to construct.
Our solution is "Advanced Construction-GK method".


■Procedure

GK method(Turnbuckle joint) GK method(Loading to a ship)
(1)Building (Turnbuckle joint)
To assemble tie rod on land-yard in advance.
(2)Loading to a ship.
To pick up the assembled tie rod with "Long Hanging Beam" made by our company, and load to a carriage ship. And then, the carriage ship carries to the construction site.
GK method(The installation site:  Step1:) GK method(The installation site:  Step 2:)
(3)The installation site: Step1:
To pick up the tie road with "Long Hanging Beam"
(4)The installation site: Step 2:

















HOMECompany OverviewProducts for SalesAffiliated companies’ information    
©2008 GOTETSU SANGYO CO ., LTD ALL RIGHT RESERVED.